Back to the blog

2027 Prospecting Calendar: Planning Campaigns in France

A 2027 prospecting calendar for France: public holidays, confirmed trade shows and a month-by-month campaign plan for small web agencies.

Open planner with a handwritten content strategy note on a wooden table

A 2027 prospecting calendar does more than tell you when to send a message. It helps you decide which offer to prepare, which businesses to select and how many replies your agency can realistically handle. For 2027, start with known dates, add your team’s absences, and work backwards to prepare your campaigns. Keep some weeks in reserve: a schedule filled twelve months ahead is not necessarily a strong schedule.

This guide is for a small web agency prospecting in France. It provides a working calendar, not a study of the best sending day. Public holidays come from Service Public and the three professional events from their organisers, checked on 20 November 2026. Monthly actions, preparation intervals and capacity examples are our proposals. They are neither official dates nor measured commercial results.

The method comes down to four decisions. Select a segment and a specific problem for each campaign. Reserve time to check businesses and prepare a credible offer. Plan for replies and delivery before increasing outreach. Finally, each month, reallocate time from less relevant campaigns rather than mechanically sending whatever was scheduled.

Official dates to add to your 2027 calendar

Here are the eleven national reference dates:

Public holiday2027 date
New YearFriday 1 January
Easter MondayMonday 29 March
Labour DaySaturday 1 May
AscensionThursday 6 May
Victory DaySaturday 8 May
Whit MondayMonday 17 May
National DayWednesday 14 July
AssumptionSunday 15 August
All SaintsMonday 1 November
ArmisticeThursday 11 November
ChristmasSaturday 25 December

Alsace-Moselle: check Good Friday (26 March), which applies in certain municipalities, and 26 December. Overseas: consult local dates in the official 2027 list.

For commercial planning, a public holiday should trigger a check, not an automatic conclusion. A shop may remain open; an individual may be away during a different week. Do not turn these dates into a universal list of prohibited or recommended sending days. Your availability and your prospect’s availability remain separate pieces of information.

Add an “availability to confirm” column alongside dates that might affect operations. It can concern your team, the client, a technical partner or a contractor. Moving a sales meeting is often manageable; promising a website launch without anyone available to check it is much harder. The calendar also protects commitments you have already made.

Three professional events as planning anchors

As checked on 20 November 2026, Franchise Expo Paris announces 13–15 March 2027. GO Entrepreneurs Paris announces 28–29 April. GO Entrepreneurs Lyon announces 23 September. Recheck practical information, programmes and participation conditions before travelling or making a purchase.

These events are not compulsory entries in your plan. An agency working with tradespeople in one area may gain more from a local partnership than from travelling. An agency targeting networks, however, needs to understand where decisions sit between head office and individual locations. An event’s existence does not prove its visitors are looking for your service.

For each event you consider, write a verifiable objective: clarify three network needs, meet an identified partner, or understand a segment better. Avoid using “find clients” as your only criterion. That phrase does not help you choose whom to meet or decide afterwards whether attending was useful.

To prepare your visit, see the guide to visiting a B2B trade show without a booth. The focus here is different: reserving preparation and follow-up capacity within an already busy year. Do not launch an important campaign during an event week if nobody can handle the enquiries afterwards. The attention required by travel belongs in the same capacity plan as ordinary commercial work.

Build an annual calendar in four layers

Three colleagues gathered around a laptop and taking notes

Start with a fixed layer: known dates, confirmed absences, client commitments and internal deadlines. A second layer contains commercial hypotheses, such as a redesign offer for a particular category of shops. A third represents your actual capacity for research, writing, meetings, quotations and production. The fourth is a reserve for unexpected work and opportunities worth changing the plan for.

This separation prevents an idea from becoming an accidental commitment. “Research neighbourhood restaurants in June” does not mean “deliver four websites before July.” Use explicit statuses in your table: idea, research, ready, active, paused and complete. Assign an owner and a next decision to each campaign. A date without an action or an owner does not manage anything.

A simple spreadsheet is enough. Create columns for month, segment, observed need, offer, evidence to prepare, starting date, reserved time, next review and stopping condition. Include links to the sources used to select businesses. Do not enter a sales forecast without a basis for estimating it. Begin with quantities of work you can actually control and review.

The following calendar is an operational proposal. It does not assume every business follows the same season or that any month guarantees more replies. Use it as a starting point, then replace assumptions with what you learn about your market. Moving, reducing or cancelling a campaign does not mean you have failed your annual plan. It can mean the plan is doing its job.

January to March: choose a target and prepare the first cycle

January: narrow the field. Choose a primary segment and an area where you can understand the businesses. Prepare a short list with a specific reason for each entry. A website that is difficult to use on mobile, a publicly announced new activity or an unclear offer may justify investigation, but not an automatic conclusion that a need exists. Your monthly output is a one-page campaign brief and an example of a repeatable diagnostic.

Do not immediately combine restaurants, professional practices and industrial companies. You risk getting responses that are impossible to compare. Also reserve time to revisit older enquiries with an agreed next step. A new calendar should not erase a real commitment simply because another idea seems more exciting. Start by protecting what is already meaningful.

February: build the evidence. Take your offer and check that you can explain what will be delivered, what will not, and what the client must provide. Prepare a clearly fictional example if you do not yet have work you can publish. For a campaign linked to a March event, begin checks early enough to avoid improvising your explanation the day before.

The signal to look for is not “February is a good month.” It is an observable situation making your proposal relevant to that business. Retain the source and date of the observation. If you cannot explain in one sentence why your message is addressed to this prospect, continue researching rather than inventing personalisation. A convincing reason should come before the wording of the email.

March: run a limited first cycle. Test your selection process, your ability to respond and the clarity of your offer. For a network-focused target, the franchise event can provide a learning anchor; it does not replace identifying the appropriate person. Schedule an end-of-cycle review covering objections, recurring questions and corrections needed before the next campaign. The purpose is to learn what the process needs, not to declare success from activity alone.

April to June: turn lessons into a repeatable campaign

April: revisit real questions. Turn questions you received into useful material: the scope of a brochure website, content needed to start, or how a redesign is organised. A clear page explaining your method may help more than another, more insistent message. If you use the Paris event as an anchor, reserve time afterwards to handle whatever was agreed.

A suggested output is an improved offer and a meeting-summary template. Do not conclude a campaign works because someone was friendly. Distinguish an informative reply, genuine interest, a quotation request and a commitment. This distinction lets you reallocate time in the following quarter without confusing activity with commercial progress. Record uncertainty rather than promoting every conversation to an opportunity.

May: anticipate interruptions. Confirm availability within your team and among essential partners. Limit launches requiring several closely spaced approvals when those approvals are not confirmed. Available time can be used to clean lists, verify sources and finish supporting material, without assuming everyone is absent. The point is to coordinate dependencies, not to write off a month.

Do not postpone an expected reply simply because the calendar suggests a possible long weekend. Follow the individual’s instructions. If a project must wait, record a restart date chosen with that person rather than creating a series of automatic follow-ups. Your organisation should remain capable of handling a real enquiry during a less regular period, even if new outreach is smaller.

June: prepare the summer handover. Review projects to deliver, outstanding quotations and campaigns that remain relevant. For a seasonal business, verify its actual season before associating June with a particular need. An agency can prepare an improvement for after peak activity rather than proposing intervention at the least practical moment. The output is a list of decisions needed before absences, with a replacement owner where necessary.

July to September: maintain follow-up and prepare the restart

Overhead view of a person taking notes beside a laptop

July: match workload to actual availability. Maintain response and follow-up capacity for conversations already underway. Reduce new campaign starts if the team cannot absorb replies. This reduction is not a claim about prospect behaviour; it is an internal capacity decision. A small, properly managed campaign can be more useful than a large one whose replies are neglected.

Prepare a handover procedure too. For each active opportunity, record the most recent promise, the next action and the available documents. A colleague taking over should not need to restart qualification from scratch. Share only the information needed for continuity, within the tools and access arrangements your organisation has established. A clean handover protects both working time and the quality of the conversation.

August: maintain readiness without assuming silence. Check which businesses continue operating and which have announced closures. If you are away yourself, favour internal preparation over a campaign that would demand a quick response. You can update examples, simplify a contact form or prepare a September list without claiming August is universally unproductive. Some preparation is valuable precisely because it does not create an immediate obligation to reply.

The useful output is a ready campaign, not a pile of messages based on stale information. Repeat essential checks before activation. An offer, person or webpage may have changed since the initial selection. Preparation gains value when it remains open to revision. Keep the reasons for selecting each business visible so another review can be quick and meaningful.

September: restart with clear criteria. Reactivate one segment at a time and check meeting capacity before increasing volume. The Lyon event can be an anchor if its participants and your objective are relevant. Do not promise fast delivery solely to exploit a general sense of returning to business. The output is an opportunity table showing the next decision, its date and available production capacity.

October to December: prioritise, deliver and prepare the next year

October: choose which campaigns to continue. Compare segments using observable criteria: conversation quality, qualified requests, preparation time and proposal workload. A longer list is not necessarily more valuable. Reserve the remaining weeks for activities you can follow through and projects you can deliver properly. Leaving an unsuitable campaign behind is a deliberate allocation decision, not an admission that the entire year failed.

For businesses preparing a year-end promotion, confirm the date and need with them. Do not impose a promotional campaign on a company that does not want one. Propose a realistic scope: repairing a user journey, creating a dedicated page or clarifying an offer, only when it addresses an observed problem. The calendar must not become an excuse to sell invented urgency.

November: protect commitments. Review promised milestones and decision-maker availability. Before a new quotation, establish who will provide content and who can approve it. If those conditions are missing, separate preparation from launch. A plausible delivery date is better than an appealing promise that ignores dependencies. A commercial opportunity does not remove the work needed to complete it.

This month can also be used to prepare the following calendar. List what you genuinely know: internal overload periods, observed approval delays, useful topics and unsuitable channels. Do not turn one success into a general rule. Retain the hypotheses that still need testing. When evidence is limited, label the decision as a provisional choice and set a review point rather than presenting it as a proven seasonal pattern.

December: close cycles properly. Confirm next steps for opportunities still open and archive those that no longer have a reason to remain active under your internal rules. Prepare a clear restart, with realistic dates and information to recheck. The output is not a January volume target. It is a short list of justified actions and capacity reserved to carry them out without losing context.

The D−21, D−7 and D+2 preparation workflow

Let D mean a campaign’s starting date, not necessarily the date of a trade show. At D−21, choose the segment, define the problem, check sources and reserve follow-up time. Also decide what would make you stop: weak data, an unclear offer or production that is already full. Three weeks is a proposed working interval here, not a demonstrated optimum.

At D−7, review the selection and message with fresh eyes. Check the recipient, offer relevance, availability and your ability to handle a reply. Test your own links and contact journey. Clarify the rules applicable to your chosen channel when necessary; this calendar does not replace a compliance review. A campaign should be operationally ready, not merely written.

At D, start at a scale you can manage. At D+2, review execution: replies received, errors detected, information to correct and requests requiring action. D+2 is not a universal instruction to send a follow-up. A date requested by a prospect, or an objection to further contact, takes precedence over your template. If the review falls during an absence, arrange cover or choose another starting date.

For an event, use a second line for your attendance date and follow-up commitments agreed there. Do not merge a campaign review with a meeting summary. This prevents sending a generic message to someone you already met or treating a real conversation as another list entry. The workflow should preserve context, not erase it for the convenience of the schedule.

A fictional capacity example makes the plan concrete

Imagine a two-person agency reserving six hours each week for acquisition: two hours for research and checks, two for preparing outreach, and two for replies and next steps. This allocation is a fictional example, not a productivity recommendation. It predicts neither a number of clients nor a number of messages to send. Your actual allocation depends on the work and responsibilities involved.

Suppose a complex enquiry requires an extra hour. The agency can reduce preparation of new contacts that week rather than removing follow-up. If a client delivery becomes urgent, it pauses a campaign still at the idea stage and preserves replies already promised. Reserve capacity is not wasted time: it makes trade-offs visible and prevents competing commitments from silently exceeding the week’s available hours.

In your table, separate planned hours, available hours and hours actually used. If you regularly lack time for proposals, increasing research may make the problem worse. To put this calendar into a wider client acquisition process, see the practical plan for finding web agency clients. For organising company research within your agency workflow, see SprintLead for agencies, without confusing software with the annual strategy itself.

Frequently asked questions

Should all prospecting stop during holidays?

No, this calendar cannot establish that. Check your response capacity, what individual contacts have told you and the particular characteristics of your target. You can reduce new outreach while preserving useful follow-up. A blanket rule covering an entire month is too crude to guide every agency, especially when internal and external availability differ.

What is the best day to launch a campaign?

We do not claim one. Start with a period when your team can respond, then observe your own context without confusing correlation with cause. A comparison only makes sense when segment, message and offer are considered. Official dates are potential constraints, not evidence of commercial performance. Your ability to follow through remains part of the choice.

Should every trade show be included?

No. Keep only those for which you can define a useful objective and afford the required time. A confirmed date implies neither mandatory attendance nor profitability. Recheck information with the organiser before booking and plan follow-up before deciding to travel. An event can be relevant without being the best use of this year’s limited capacity.

Your 2027 calendar should connect each campaign to a target, evidence, capacity and a next decision. Add known dates, distinguish your hypotheses and reserve time for replies. Begin with one properly prepared cycle, then adjust the rest of the year to what you learn. A good plan does not mechanically send more messages. It helps you do relevant work when you can responsibly follow through.